Data Centre 1

  • Location: Slough
  • Client: Caunton Engineering
  • Main: Laing O’Rourke
  • Tonnage: 1200 tonne
Scope of Work: Erection of 1200tns steel over 3 floors with heavy plate girders, metal decking and lift cores. No footprint access on this one for craneage so all lifted from outside main grids. Gantry Steel including open steel flooring and handrail

Sectors

Commercial & Education

Data Centres

Industrial

Power Sector

Multi Story Car Parks

Retail

Stadia & Conference

Other