- Location: Farringdon London
- Client: Bourne Steel
- Main: Mace
- Tonnage: 1200 Tonne
Scope of Work:
Erection of 5 floors of steel works ontop of existing Crossrail station, working around a central stair core and only having the footprint of the structure to work in provided many logistical challenges including close interface with the public and live roads on 3 sides of the construction site.