Farringdon Overdeck

  • Location: Farringdon London
  • Client: Bourne Steel
  • Main: Mace
  • Tonnage: 1200 Tonne
Scope of Work: Erection of 5 floors of steel works ontop of existing Crossrail station, working around a central stair core and only having the footprint of the structure to work in provided many logistical challenges including close interface with the public and live roads on 3 sides of the construction site.

Sectors

Commercial & Education

Data Centres

Industrial

Power Sector

Multi Story Car Parks

Retail

Stadia & Conference

Other